Busy time for the Install Team
Our Installations team have been working hard on projects for two Sussex Schools
The works for Lewes Old Grammar School at the end of October involved the removal of an existing lighting bar in their drama studio and then replacement with 4 new bars to make a square lighting position to increase their available lighting capacity. We also took the opportunity to PAT test and clean all their fixtures ready for the next school term.
Back in the summer we relocated to Claremont Senior School at Bodium for 5 days for a complete lighting and sound installation for their school theatre 'The Space'.
This extensive job included the installation of 3 internally wired bars, a brand new dimmer rack, ETC Lighting desk and a range of generic fixtures.
We also worked on a sound system for the venue which included 2 new speakers, amplifier and control rack.
We were really happy that we were able to assist the individual schools to make the most out of their separate venues with new rigging points and equipment.
If you are interested getting a quote from us for a venue installation please call us on 01323 819219 or email via the contact page.